Rabu, 07 Agustus 2019

ANALISIS TEBAL PERKERASAN JALAN

ANALISIS TEBAL PERKERASAN JALAN

Dalam menghitung tebal perkerasan jalan, baik perkerasan lentur atau perkerasan kaku, kita bisa memilih untuk menggunakan beberapa metoda, antara lain :

1. Perkerasan Tebal Perkerasan Lentur Jalan (Metoda Analisis Komponen SKBI - 2.3.26.1987) 
    https://drive.google.com/file/d/1nGHFe2HK4kZmqkQjQRKoRrBHkRCF4sEW/view?usp=sharing

2. Perkerasan Lentur (PdT  01-2002-B)
    https://drive.google.com/file/d/1KiC8ZGSvfdpccbitCwS6LqtBcHP8bwQ_/view?usp=sharing

3. Perkerasan Kaku (PdT  14-2003)
    https://drive.google.com/file/d/15VPiM_b7dxAcs39dCcovbHhPME7jngL3/view?usp=sharing

4. Overlay lentur dengan metoda lendutan (BB dan FWD) (PdT-05-2005-B)
    https://drive.google.com/file/d/12nANQXHDITPpnyBO6AkfS9O-JsC3iMeU/view?usp=sharing

5. Manual Desain Perkerasan Jalan (Revisi Juni 2017 No. 04/SE/Db/2017)
    https://drive.google.com/file/d/1pfx6CfPmbbMQJ2y8vVbYzGtRnKX05IpQ/view?usp=sharing

Sampai sekarang,terutama di wilayah Departemen Pekerjaan Umum, yang diminta oleh owner biasanya mengacu ke Manual Desain Perkerasan Jalan 2017.

Bagaimana cara menghitungnya?? BACA...!! Haha..

Selain metoda diatas, ada juga metoda AASHTO, AUSTOROADS, dll. I'll share it next time..

Minggu, 05 Mei 2019

ANALISIS HARGA KESELAMATAN DAN KESEHATAN KERJA KONSTRUKSI (K3) BIDANG PEKERJAAN UMUM

ANALISIS HARGA KESELAMATAN DAN KESEHATAN KERJA KONSTRUKSI (K3) BIDANG PEKERJAAN UMUM


Untuk para QS plat merah.. di Spesifikasi Umum tahun 2018, pekerjaan K3 harus di bayar tersendiri, dimana sebelumnya (Spesifikasi Umum tahun 2010 rev.3) tidak ada pembayaran terpisah.
Buat yang lagi bingung nyari contoh analisis harganya, mangga disedot contoh berikut gan....

Surat Edaran Menteri PUPR No. 66/SE/M/2015.

https://drive.google.com/file/d/1XWKnalzWeWu76p5H1HPtErL5Hdw0S4xj/view?usp=sharing

Buat yang udah pake Panduan AHS 5.0 terbaru, di divisi 1 sudah ada form untuk pekerjaan K3 ini lho.. file nya ada di post https://noeroel-bebasaja.blogspot.com/2016/02/belajar-membuat-analisa-harga-satuan.html


Semoga bermanfaat.

Senin, 25 Maret 2019

ANALISIS HARGA SATUAN DENGAN PERMEN PUPR NO.28 TAHUN 2016

ANALISIS HARGA SATUAN DENGAN PERMEN PUPR NO.28 TAHUN 2016


Buat para Estimator, yang sedang galau cari bahan untuk membuat Analisis Harga Satuan (AHS), ada satu sumber lagi nih yang bisa digunakan untuk dasar AHS. Biasanya sih di wilayah Kementerian PUPR pakai ini (Peraturan Menteri PUPR  Nomor : 28/PRT/M/2016). Sebenarnya isinya sama dengan SNI, tapi kalau di Permen ini, sudah di rangkum jadi satu, jadi ga usah buka-buka banyak file.

Permen ini dibagi 4 bagian :

  • Bagian 1 : Bidang Umum
  • Bagian 2 : Bidang Sumber Daya Air
  • Bagian 3 : Bidang Bina Marga
  • Bagian 4 : Bidang Cipta Karya

Permen ini masih berdasar pada Spesifikasi Teknis 2010 ya..

Mangga di sedot gaaann...

https://drive.google.com/drive/folders/1-gsTA2IhfEWl4xiFHrJhpLjxfz3uaqpg?usp=sharing

Kamis, 20 Desember 2018

SPESIFIKASI KHUSUS INTERIM - PEKERJAAN JALAN DAN JEMBATAN

SPESIFIKASI KHUSUS INTERIM - PEKERJAAN JALAN DAN JEMBATAN


Ada beberapa jenis pekerjaan yang tidak ada di Spesifikasi Umum Bina Marga, adanya di Spesifikasi Khusus, diterbitkan terpisah dari buku Spesifikasi Umum. Berikut saya lampirkan beberapa yang saya punya, mudah - mudahan bisa membantu. 

Spesifikasi Khusus Interim - Jaring Kawat (wire mesh) dan Net Kabel (cable net) Sebagai Pengaman Lereng Batuan

Spesifikasi Khusus Interim - Aspal Karet Pra-Campur

Spesifikasi Khusus Interim - Soil Nailing

Spesifikasi Khusus Interim - Beton tailing

Spesifikasi Khusus Interim - Grouting di Bawah Perkerasan Jalan

Spesifikasi Khusus Interim-Pengendali Erosi Lereng


Buat teman - teman yang punya spesifikasi khusus yang lain, ayo.. boleh di share..






Rabu, 19 Desember 2018

SPESIFIKASI UMUM TAHUN 2018 UNTUK PEKERJAAN JALAN DAN JEMBATAN

SPESIFIKASI UMUM TAHUN 2018 UNTUK PEKERJAAN JALAN DAN JEMBATAN



Ada Spesifikasi Umum yang baru lagi nih dari KeMenPUPR, untuk kegiatan perencanaan sih sudah mulai berlaku di akhir tahun 2018 ini, kalau untuk di pelaksanaan fisik, mulai berlaku untuk kegiatan proyek di tahun 2019.
Spesifikasi ini berlaku untuk pelaksanaan pekerjaan jalan dan jembatan yang tidak termasuk jalan bebas hambatan dan jalan tol. 

Apa bedanya Spesifikasi Umum Tahun 2018 ini dengan Spesifikasi Umum Tahun 2010 rev.3? cukup banyak.. hehe.. beberapa yang sempat saya baca, bedanya antara lain:

  1. Divisi 4 -- di Spek 2010 rev.3, divisi ini untuk pekerjaan bahu jalan dan pelebaran jalan, kalau di Spek 2018, divisi ini untuk pekerjaan preventif, untuk pekerjaan bahu jalan nya pindah ke Divisi 5. Apa itu pekerjaan preventif.. menurut KBBI: bersifat mencegah (supaya jangan terjadi apa-apa); intinya pekerjaan preventif ini adalah jenis - jenis pekerjaan yang berfungsi untuk mempertahankan kondisi perkerasan jalan agar tetap layak dan nyaman di lalui, jadi tidak menambah umur rencana.
  2. Divisi 8 -- di Spek 2010 rev.3, divisi ini untuk pekerjaan pengembalian kondisi dan pekerjaan minor, kalau di Spek 2018, divisi ini untuk pekerjaan rehabilitasi jembatan, seperti pekerjaan patching beton, epoxy, dll. Untuk pekerjaan minor nya pindah ke Divisi 9, dan pekerjaan pengembalian kondisi pindah ke Divisi 10.
  3. Untuk pekerjaan patching (perbaikan dengan tambalan campuran beraspal), di Spek 2010 rev.3, volumenya dibatasi 1m3 per KM panjang, kalau di Spek 2018 pembatasan ini hilang.
  4. Dan lainnya, hehe.. biar penasaran dan dibaca speknya.

Silahkan di baca ya, berikut saya lampirkan file nya.. 

Update Spesifikasi Umum 2018 rev 2 - Untuk Pekerjaan Jalan dan Jembatan

Update File Panduan Analisis Harga Satuan 5.0 (berdasar Spesifikasi Umum 2018) ada di post https://noeroel-bebasaja.blogspot.com/2016/02/belajar-membuat-analisa-harga-satuan.html

Selamat membaca...

Kamis, 13 Desember 2018

Modulus 7.0 - Backcalculation Software

Modulus 7.0 - Backcalculation Software

Modulus 7.0 is one of a backcalculation software. This software developed by Texas Transportation Institute. You can download the program at : https://pavementdesign.tamu.edu/downloading.htm

For downloading the program, password needed. You just have to ask the operator by email the request to the address that available at the website. The user manual available at this website too, and it dont need the password.

The minimum system requirements to run the program are (this is from the manual) :

  • Operation systems: Windows 95/98/ME/NT 4.0/2000/XP
  • CPU: Pentium-133 MHz or higher
  • 16 MB RAM or higher
  • 15 MB free hard drive space
  • SVGA - True Color video mode
  • For best running propose, the 1024×768 pixels screen resolution is recommended
  • CD-ROM drive (if installation is done from a CD-ROM)
  • Mouse or other suitable pointing device
  • A printer supported by the computer running the program

But here is the issues, I've tried install on Windows 10 and Windows 8, and the installation is success, but when you try to analyze the data, it only do well until you input the FWD data, when you try to input the pavement thickness the error always occur.


You can try to use the original pavement thickness from the program, but the issues occur again when you try to running the backcalculaion, or remaining life. I’ve tried asking this problem to the operator, but they only suggest to uninstalling and reinstalling the program, decline any popups during the installation that offer to update a “.dll” file by clicking no and reboot the computer after the installation finish, but it didn’t fixed the issues at all.

Based on experience, the program is running well only on Windows 7 Home Premium 64-bit (6.1, Built 7601). Yes, it running well on this OS.. why?? I still don’t know, haha..

So.. the program is installing well, and you can operate the program by following the user manual, but how can we sure that the seed moduli or the poisson’s ratio we  input are represent our pavement conditions? How did the program do the backcalculated or the segmentation? Is the modulus resilient impact the remaining life result? You can find the answer in this papers :  

FHWA/TX-05/0-1869-2
FHWA/TX - 88/1123 - 1

Data needed for the analyze :
  • Falling Weight Data (FWD) file
  • Pavement structure and thickness
  • Seed moduli per layers
  • Poisson’s ratio per layers
  • Pavement conditions (such as % crack and rutting)
  • Cummulative Equivalent Single Axle Load (CESAL)

What we can analyze with Modulus 7.0 :
  • Modulus Resilient per layers
  • Segmentation
  • Remaining Life


Sometimes we have another issues, the program cannot read our raw FWD file. How we fixed it? You can try to edit the example raw FWD file that available when you download the installation file and adjust it with our data. But remember, we have to know which number represent what.. don’t just replace the data, make sure you know how to read the raw FWD file.


For more information about raw file FWD test, you can googling the "DYNATEST FWD/HWD TEST SYSTEMS". 

Good luck..

Rabu, 10 Februari 2016

BELAJAR MEMBUAT ANALISA HARGA SATUAN

Wah..karena keseringan belajar dari om google, jadi kepikiran buat agak bantu orang lain sedikit... siapa tau ada yang bingung tentang cara membuat analisa harga satuan, kebetulan agak sedikit paham di bidang ini (ge'er mode on ;p )

Apa sih analisa harga satuan itu?? hihi, ini sih siapa tau ada yang masih bingung..
Gini lho, buat para kontraktor, kan harus ikut tender untuk dapet proyek.. nah dalam proses tender itu, harus buat penawaran harga, dan untuk masukin harga yang tadi, perlu dianalisa dulu kan, biar cocok nanti pas kerja di lapangan (analisa ini terutama untuk pekerjaan di Dinas Pekerjaan Umum, karena kalau milik swasta, jarang diminta analisanya..tapi untuk dasarnya, kita harus bisa juga lho..biar tau asal muasal harga sauat pekerjaan).

Nah, ini tahap - tahapnya :

  1. Harus ada daftar pekerjaannya... (ya iya laahhh, kalau gak ada, apa yang mau di analisa ya...hehe..)
  2. Lokasi pekerjaan harus tau, karena beda lokasi, akan pengaruh lho buat analisanya.. (misalnya, jarak quarry dari lokasi A akan beda dengan lokasi B, maka nanti akan pengaruh ke kinerja alat, kayak dump truck)
  3. Baca spesifikasi teknis yang di kasih owner (ini penting banget, meski kadang males juga...hihi, tapi kadang ada beberapa persyaratan yang diminta owner yang tercantum di spesifikasi ini, kalau gak kita baca...nanti wakwaw, alias gawat lho..langsung gugur..)
  4. Survei harga bahan, alat, dan upah di lokasi pekerjaan (kalau males, bisa search di om google juga (khusus yang belajar ya), atau bisa pakai harga rata - rata aja, kadang kalau sudah ahli, lihat pake kuku juga bisa...haha..)
  5. Survei Lokasi quarry (asal tanah/material alam), AMP (Asphalt Mixing Plant/Instalasi Pencampur Aspal) , Batching Plant (Instalasi Pencampur Beton), dll tergantung jenis pekerjaan.
  6. Nah..kalau sudah ada data - data diatas, tinggal masukkin deh ke format analisanya.. (linknya ada dibawah), 

Oya.. jangan lupa untuk mastiin dulu spesifikasi teknis yang digunakan oleh owner.. untuk di PU, ada dua jenis yang digunakan, yaitu Spesifikasi Teknis Tahun 2006 dan Spesifikasi Teknis Tahun 2010. Dua spesifikasi tadi lumayan banyak lho perbedaannya, seperti di satuan pembayaran, (contoh hotmix AC-WC, di 2006 satuannya m2, sedangkan di 2010 satuannya ton) nah kalo gitu bedanya kan cara menghitunynya juga akan beda toh..toh..toohhh..

Nah..buat yang minat.. ada contoh filenya nih dibawah..silahkan download aja... 100% free....


untuk yang pakai spesifikasi tahun 2006:
http://downloads.ziddu.com/download/25223028/AHSSPECDES2006.xlsx.html

untuk yang pakai spesifikasi tahun 2010:
https://drive.google.com/drive/folders/1SW3oh9eE-JDoNtAwB0ccGTi_N0s3v17c?usp=sharing

untuk yang pakai spesifikasi tahun 2018:


File diatas hanya untuk belajar ya.. kalau mau digunakan untuk kerjaan, mesti banyak di cek dulu karna terdapat beberapa yang menurut saya mesti disesuaikan dengan kondisi lapangan dan penilaian yang menghitung..

semoga bermanfaat.